Packaged units such as Envirofresh and Classvent units are pre commissioned at the factory prior to despatch. The units are factory pre-wired and complete with a comprehensive control system, to minimise on site installation time. All units provide full fresh air ventilation with a heat recovery device to increase the temperature of the incoming fresh air and are fully compliant with the European Directive ErP 2016 (Energy Related Products) for electrical engines and fans.
Combine with other systems such as VRV and chilled water fan coils to provide tempered fresh air. Ecodesign directive is integral to the European Union's commitment to reaching a 20% reduction in greenhouse gas emissions and energy consumption by 2020.
Combine with other systems such as VRV and chilled water fan coils to provide tempered fresh air. Ecodesign directive is integral to the European Union's commitment to reaching a 20% reduction in greenhouse gas emissions and energy consumption by 2020.
Services
This Range of MEDSAFE Air Handling Units is specifically designed for use in the healthcare and pharmaceutical industry where high standards of cleanliness and sterile cleanable surfaces are required.
Each air handling unit for this class of environments is compliant with HTM, NHS Specifications also to BS1886 Air handling unit performance specification.
Includes a complete range of plate heat exchangers, cooling, heating, direct driven fans and air-handling functions.
Fully factory tested systems, pre-wired complete with integral refrigeration components and all controls.
Each air handling unit for this class of environments is compliant with HTM, NHS Specifications also to BS1886 Air handling unit performance specification.
Includes a complete range of plate heat exchangers, cooling, heating, direct driven fans and air-handling functions.
Fully factory tested systems, pre-wired complete with integral refrigeration components and all controls.
Create a no smoking area in a public house or restaurant by supplying fresh tempered air to the non-smoking or employee areas, recovering heat from the extracted smoking area.
Combine with other systems such as VRV and chilled water fan coils to provide tempered fresh air.
Fully factory tested systems, pre-wired complete with integral refrigeration components and all controls.
Reduces site installation costs and time.
The configuration of the components maximises the heat pumps capacity and efficiency.
Combine with other systems such as VRV and chilled water fan coils to provide tempered fresh air.
Fully factory tested systems, pre-wired complete with integral refrigeration components and all controls.
Reduces site installation costs and time.
The configuration of the components maximises the heat pumps capacity and efficiency.
The classvent maintains levels of temperature and CO with variable control of both air volume and heating.
Heat recovered from the exhaust air is transferred to the fresh air to reduce the LPHW heating load.
The system responds quickly to occupancy changes.
When unoccupied the system reverts to energy saving temperature set back mode with full recirculation of air flow.
When occupied the system provides uniform distribution of temperature and fresh air.
Classvent provides an energy efficient solution to providing a good environment for teaching and learning.
Heat recovered from the exhaust air is transferred to the fresh air to reduce the LPHW heating load.
The system responds quickly to occupancy changes.
When unoccupied the system reverts to energy saving temperature set back mode with full recirculation of air flow.
When occupied the system provides uniform distribution of temperature and fresh air.
Classvent provides an energy efficient solution to providing a good environment for teaching and learning.
Air Handlers Northern Ltd provides a comprehensive portfolio of sitework options to assist contractors and end users, together with a factory testing facility can offer certified performance tests.
As remodelling of buildings becomes more predominant in the construction industry access into the building for replacing AHU plant becomes more complicated than with a new build.
Air handlers have completed hundreds of site build flat pack installations over the years, the largest site build project completed in 1992 at Proctor & Gamble Trafford Park Pampers Nappy manufacturing plant.
As remodelling of buildings becomes more predominant in the construction industry access into the building for replacing AHU plant becomes more complicated than with a new build.
Air handlers have completed hundreds of site build flat pack installations over the years, the largest site build project completed in 1992 at Proctor & Gamble Trafford Park Pampers Nappy manufacturing plant.
Reviews
Be the first to review Air Handlers.
Write a Review